First Galileo Satellite Repositioned02/10/2009 |
| Surrey Satellite Technology (SSTL), UK, has completed the repositioning of the first Galileo test satellite, GIOVE-A, to a higher orbit to make way for the operational satellites of Europe's satellite navigation constellation. From the GIOVE-A operational headquarters, the operating team executed a series of precisely planned manoeuvres during July and August that have repositioned the satellite 113km above the orbit that the 27 operational Galileo navigation satellites will occupy. |
|
Since its launch in December 2005, GIOVE-A has achieved all of its mission objectives and remains in excellent condition well beyond its design life of two years. The test satellite has secured the Galileo frequency filings with the International Telecommunication Union (ITU), facilitated the experimental reception of navigation signals from Medium Earth Orbit (MEO) and collected data to characterise the MEO environment using two different radiation-monitoring instruments. The mission has also flight-proven the main technologies developed for Galileo such as the highly accurate atomic clocks.
GIOVE-A remains fully operational, and has sufficient propellant remaining for further manoeuvres. During transit to its new orbit, the Galileo navigation signal broadcasting was temporarily suspended because the precise orbit determination that is required to generate usable navigation data for the GNSS user community was not possible, There are two optimal windows during the year to perform repositioning manoeuvres. No further manoeuvres are planned in the current window, therefore the payload has been successfully switched on again and the spacecraft has now resumed broadcasting navigation signals from its new orbit.
A further repositioning exercise may be performed to raise the orbit higher still before GIOVE-A is finally de-commissioned.
GIOVE-A was developed and manufactured by SSTL within a 30-month, EUR28M contract. The company continues to operate the satellite from its Guildford, UK facilities and has also undertaken or contributed to the GIOVE-A and GIOVE-B testing programmes that are the foundations of the future Galileo satellite navigation system and the operational satellite development.
OHB and SSTL jointly form one of the two consortia now bidding for the development and construction of 28 satellites for the operational Galileo service. By allowing two consortia to build spacecraft for this important European undertaking, ESA and the EU would ensure that the full operational capability can be put in place as soon as possible and at best value to the taxpayer. The system is to be fully operational by 2013 following full contract signature expected in late 2009.
Read more about: GNSS Galileo satellite navigation Supplier: Surrey Satellite Technology Ltd (SSTL) More news from this supplier: New Satellite Demonstrates High Resolution Capability Nigerian Satellite Acquires First Image Days After Launch NigeriaSat-2 Completed Pre-launch Testing Satellite Smartphone App Contest SSTL Expands in New Building ‘Middle-East to Benefit from Opportunities in Space' NigeriaSat-2 Satellite Launch Announced SSTL Restructures for Strategic Growth Achievement Award for Sir Martin Sweeting Fourteen Galileo Navigation Satellites CyberCity 3D Launches 3D Solar Buildings Second UltraCamX for Valley Air Photos Capacity Building to Develop Afghan Mining Feasibility Reports for Uganda and Jordan NSDI Five-metre Imagery for Vegetation Analysis UAE University to Receive Professional GIS Training Topcon Great Britain Positioning Business Manager United Oilfield Services Select Sercel UNITE Mars-bound Instrument Detects Solar Burst's Effects Blom to Divest Danish Subsidiary Comments (0): |
| News |
| News > First Galileo Satellite Repositioned |
|
Interactive |
3D Scanning of Historic Sugar Factories |
|
The Alliance for Integrated Spatial Technologies at the University of South Florida, USA, recently worked with the Florida Park Service on a project to document the remains of several historic sugar-mill sites in the State Parks to create as-builts to be used in preservation and conservation of these resources. The FARO LS 880, along with GPS and total station georeferencing and colour imaging, was used on these projects.
|
| Last 5 items: |
| 3D Scanning of Historic Sugar Factories |
| Road Improvement Survey with UAV |
| 3D BIM + money = 5D |
| Setting up a survey in a swamp |
| Launch of the 9th Baidu Satellite |
