Poll

Are you considering working with an UAV for surveying?


Spacer
Product News
Product News > Update for Bentley Substation V8i

Update for Bentley Substation V8i

  28/07/2010
Bentley Systems has released the V8i (SELECTseries 3) version of Bentley Substation, the first intra-operable software for intelligent electrical and physical substation design. Bentley Substation empowers project teams to design substations 30% faster than they typically can with non-integrated applications.



The software's single interface for substation design and the common intelligent information model enable users to design more precisely, generate accurate bills of material, create drawings quickly and efficiently, and rigorously enforce company standards. At the same time, Bentley Substation's integration with ProjectWise collaboration services provides superior engineering content management and team collaboration that support the entire substation design workflow.

 

The new release, which has been streamlined for the single purpose of substation design and management, offers:
• expanded integration with ProjectWise, enhancing project team collaboration and increasing productivity;
• broad interoperability and data reuse via new support for i-models (containers for open infrastructure information exchange), facilitating ease of review and markup;
• improved model visualization using dynamic views that enable users to work in 2D or 3D views simultaneously, making the design process much more productive;
• access to an expanded library of 3D objects and industry-standard 2D symbols, speeding design and improving information exchange;
• ease of installation and use, resulting in low start-up and administration costs.

Bentley Substation V8i (SELECTseries 3) leverages Bentley's technology platform, a comprehensive set of drawing, modeling, and data services that provides a robust environment for 2D and 3D design. Because the platform can produce drawings in both DGN and DWG file formats, Bentley Substation's many advantages have now been extended to substation design departments employing AutoCAD.

 

The expanded integration of Bentley Substation with ProjectWise:
• saves design teams significant time and further increases productivity by supporting the creation of substation projects from within ProjectWise Explorer;
• reduces errors and fosters more collaborative workflows by facilitating the synchronization of project files and project databases;
• provides faster access to data about parts used in a design through the software's support of the ProjectWise component tree;
• helps users quickly find the right data in the right version by enabling report outputs and project backups to be stored in ProjectWise;
• provides enhanced flexibility by allowing users to rename or delete projects, as well as rename, delete, copy and paste, or move pages in ProjectWise Explorer.

 

The software's new ability to generate i-models, which combine 2D and 3D geometry and other design data in a single lightweight container, further facilitates open information exchange. Every i-model includes provenance and is self-describing, which means source application logic isn't required to display or describe the data stored within them. Because i-models are widely reusable, they enable project teams to easily reference, repurpose, and republish content for broad information access. For example, substation design teams can now use Bentley's Navigator V8i dynamic collaboration software, which leverages the rich information stored inside i-models, to explore complex designs, query business data, and provide markup comments.






Read more about:  3D  software 
Website: http://www.bentley.com/substation
Supplier: Bentley Systems Inc.

More news from this supplier:
The Year in Infrastructure 2011
Winners of 2011 Be Inspired Awards Recognised
Bentley Systems Acquires Pointools
Bentley Receives Oracle Spatial Excellence Award
Leading Universities in Brazil Join Be Careers
Be Inspired: Bentley 2011 Awards
Flexible Licencing Policy
Be Together: The Bentley User Conference
Bentley V8i (SELECTseries 2) Versions
2010 Be Inspired Awards Winners


CyberCity 3D Launches 3D Solar Buildings
Second UltraCamX for Valley Air Photos
Capacity Building to Develop Afghan Mining
Feasibility Reports for Uganda and Jordan NSDI
Five-metre Imagery for Vegetation Analysis
UAE University to Receive Professional GIS Training
Topcon Great Britain Positioning Business Manager
United Oilfield Services Select Sercel UNITE
Mars-bound Instrument Detects Solar Burst's Effects
Blom to Divest Danish Subsidiary


     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Most Popular articles Most Popular News Most Popular Jobs
Spacer


Spacer
Spacer
Spacer
Spacer
 

Interactive


3D Scanning of Historic Sugar Factories

The Alliance for Integrated Spatial Technologies at the University of South Florida, USA, recently worked with the Florida Park Service on a project to document the remains of several historic sugar-mill sites in the State Parks to create as-builts to be used in preservation and conservation of these resources. The FARO LS 880, along with GPS and total station georeferencing and colour imaging, was used on these projects. 

 

 Last 5 items:
 3D Scanning of Historic Sugar Factories
 Road Improvement Survey with UAV
 3D BIM + money = 5D
 Setting up a survey in a swamp
 Launch of the 9th Baidu Satellite
 
Spacer
Spacer
Spacer
Spacer
Spacer