Poll

Are you considering working with an UAV for surveying?


Spacer
News
News > Smart Grid Study Identifies Utility Hurdles

Smart Grid Study Identifies Utility Hurdles

  24/08/2010
US utilities must correct, update, and integrate customer and infrastructure data before a smart grid can be effectively implemented, according to a benchmark study conducted by Esri. The smart grid, a popular plan to add communication and computer technology to electric networks, promises to make energy cleaner and more reliable.



Of the 226 study respondents, 71% view geographic information system (GIS) technology as strategic to the smart grid; the remaining 29% believe GIS plays a significant role. According to the study, utilities report a lag time of up to 90 days to move data from the field into the GIS. Data accuracy is reportedly spotty, and data is either incomplete or not GPS accurate.


Utility operators will need GIS for crucial smart grid requirements such as collecting and updating data and managing the installation of smart meters and sensors. GIS is also seen as a critical tool for analysing energy consumption and incorporating renewable energy resources. 

 





Read more about:  geographic information system  GIS  GPS 
Website: http://www.esri.com/smartgridstudy
Supplier: Esri (Headquarters)

More news from this supplier:
Research into Utility GIS Benefits
Spatial Base for Maryland's Budgeting
Access National Geographic World Basemap at ArcGIS Online
Harrison County Citizens Access Election Information Online
ArcGIS Runtime SDK for Android
Bill Clinton to Speak at Eye on Earth Summit
Discussion on Adapting to Climate Change
International Tech Hub Opens in Middle East
Report: Esri Leading GIS Provider in Utilities Sector
Esri Assists Thailand Flood Response


GMES Initial Operations (GIO) Land Monitoring Services
Rugged Trimble Juno Series
Olympic Planning Rerouting During Olympic Congestions
Dutch Minister to Open Geospatial World Forum 2012
TatukGIS Developer Kernel 10 Upgrade
Netcad Asia Convention
Community Heritage Project Using GIS Visualisation
Teaching Award for Russell G. Congalton
ION Autonomous Snowplough Competition Winners
GeoCore 2012 with Lidar API


     


Comments (0):
There are no comments yet.
Make your comment:
Name:
Your comment:
Type over the 2 words (or number) from the picture
 
Most Popular articles Most Popular News Most Popular Jobs
Spacer


Spacer
Spacer
Spacer
Spacer
 

Interactive


3D Scanning of Historic Sugar Factories

The Alliance for Integrated Spatial Technologies at the University of South Florida, USA, recently worked with the Florida Park Service on a project to document the remains of several historic sugar-mill sites in the State Parks to create as-builts to be used in preservation and conservation of these resources. The FARO LS 880, along with GPS and total station georeferencing and colour imaging, was used on these projects. 

 

 Last 5 items:
 3D Scanning of Historic Sugar Factories
 Road Improvement Survey with UAV
 3D BIM + money = 5D
 Setting up a survey in a swamp
 Launch of the 9th Baidu Satellite
 
Spacer
Spacer
Spacer
Spacer
Spacer