Delay for Cartosat-2B
News

Delay for Cartosat-2B

The launch of ISRO`s Polar Satellite Launch Vehicle (PSLV-C15), with Cartosat-2B as one of the satellites to orbit during its mission, fixed for 9th May 2010 has been rescheduled. The new date for the launch of PSLV-C15 mission will be decided after preliminary results of the analysis are obtained.



A marginal drop in the pressure in second stage of the vehicle was noticed during the mandatory checks carried out on the PSLV-C15 vehicle.


PSLV-C15 is planned to launch India`s Cartosat-2B, an Algerian satellite ALSAT-2A, two nano satellites NLS 6.1 and NLS 6.2 from University of Toronto, Canada and STUDSAT, a satellite built by students from academic institutions in Karnataka and Andhra Pradesh.


Geomatics Newsletter

Value staying current with geomatics?

Stay on the map with our expertly curated newsletters.

We provide educational insights, industry updates, and inspiring stories to help you learn, grow, and reach your full potential in your field. Don't miss out - subscribe today and ensure you're always informed, educated, and inspired.

Choose your newsletter(s)

News